Construction Tools
RSMeans formula. Walls plus ceiling. Doors and windows deducted. Screws and compound included. Voice readback for job sites.
Updated May 2026
Home Depot and Menards both offer contractor delivery on full pallet orders. No affiliate deal here yet. We are working on it. Until then: call your local lumberyard and ask about contractor pricing. The savings add up on a whole-house hang.
This calculator follows the RSMeans (Gordian) industry-standard formula, which is the same method used by professional estimators on residential and light commercial jobs.
Drywall cuts are not returnable after opening. Running short mid-project costs you a trip and possibly a full day of waiting on delivery. Running 5 percent over means you have corner patches and closet repairs covered for years. The 10 percent standard is the floor, not a target to beat.
Use 12 percent if the room has angled walls, multiple interior closets, or window count above four. Use 15 percent if the room has vaulted ceilings, archways, or any non-rectangular geometry.
4x12 sheets cut horizontal joints out of a 9-foot wall. That means less taping, less mud, and a flatter finish. The downside: a 4x12 half-inch sheet weighs roughly 88 pounds. You need a second person on the lift or a proper deadman tool for the ceiling hang. For 8-foot ceilings, 4x8 sheets are almost always the better call. For 9-foot-plus, the 4x12 labor savings often justify the handling challenge.
The calculator estimates screws at one 1-pound box per 180 sq ft (trade standard at 16-inch stud spacing, 32 screws per 4x8 sheet). A standard 1-pound box holds roughly 200 coarse-thread 1-5/8-inch drywall screws, which covers about 6 sheets before you run out. Buy one extra box. Screws are inexpensive and running short mid-hang is a job-site emergency.
Joint compound is estimated at one 4.5-gallon bucket per 200 sq ft. This covers the tape coat, second fill coat, and finish skim for Level 4 finish. If you are targeting Level 5 (skim entire surface), add 25 percent to the compound estimate.
"Always add 10 percent minimum. I learned the hard way on a small bathroom -- came up 2 sheets short on a Friday afternoon. Never again." -- thread on r/DIY
"For complex rooms with lots of corners and cutouts, I go 15 percent. The offcuts help me patch later jobs too." -- r/Construction
"4x12 on 9-foot walls is the move. Half the taping, half the mud, cleaner finish. Just get a buddy for the ceiling." -- r/Drywall